Akpan, Methodologi for Determining Price Variation in Project Execution, Journal of construction Engineering and Management, ASCE, 2001 Iman Soeharto, “Manajemen Proyek: dari Konseptual sampai Operasional”, (Jakarta: Erlangga, 1995), hal 100. Bubashait, Owner Involvment in Construction Project in Saudi Arabia, Journal of Management in Engineering, April 1992, hal.177. Kimmens, Project Management a Reference for Proffesional, (Marcel Dekker Inc., 1989)Ī. ![]() Baccarini, The Logical Framework Method for Defining Project Success, Departeman P&K, Ilmu Manajemen Konstruksi untuk Perguruan Tinggi, Universitas Tarumanegara, (Jakarta, 1998), hal 15. Chan, Framework of Success Criteria for Design/Build Project, Journal of Management in Engineering, (July 2002), hal 120.ĭ. ![]() ![]() Iman Soeharto, ”Manajemen Proyek: dari Konseptual sampai Operasional, (Jakarta: Erlangga, 1995), hal 1-2.Ī. PMBOK, A Guide to The Project Management Body of Knowledge, (Pennsylvana USA: Project Management Institute,2004).īarrie.D, “Manajemen konstruksi Profesional”, (Jakarta: Erlangga), hal 10.
0 Comments
Leave a Reply. |